mag 22, 2018 / by OSadmin / In Senza categoria / Leave a comment
21 May 2018
The fourth day started by taking stock of the situation of material ready to be put into production, to decide the order to use the available equipment. Today, the group that deals with the archive decided to follow the project that involves the interaction between Barbie and the performer. A blue screen was set up to take test pictures, while part of the group followed the creation of a background to apply to Barbie in post-production, also relying on the help of members of other groups of authors. The final music of the performance was composed, and a dress was sewn for Barbie with the fabric obtained from a modification to the performer’s dress so that it was almost identical. After creating a suitable background, tests were made with the projector to verify the fit of the image to the screen. In order to have all the materials ready for editing, the filming of the doll and the performer are substantially missing, for which the last part of the choreography must be completed. The day ended with a short video interview.